{"id":141,"date":"2015-12-03T03:16:05","date_gmt":"2015-12-03T03:16:05","guid":{"rendered":"http:\/\/emra.com\/wp\/?page_id=141"},"modified":"2016-02-19T01:36:37","modified_gmt":"2016-02-19T01:36:37","slug":"replacement-heating-system-sizing","status":"publish","type":"page","link":"https:\/\/www.emra.com\/index.php\/services\/building-operations-efficiency-consulting\/replacement-heating-system-sizing\/","title":{"rendered":"Replacement Heating System Sizing &#038; Preparation of Engineering Design Specifications"},"content":{"rendered":"<div id=\"x-section-1\" class=\"x-section\" style=\"margin: 0px; padding: 45px 0px;  background-color: transparent;\" ><div id=\"\" class=\"x-container   max width\" style=\"margin: 0px auto; padding: 0px; \" ><div  class=\"x-column x-sm x-1-1\" style=\"padding: 0px; \" ><div id=\"\" class=\"x-text\" style=\"\" ><h3><strong>Replacement Heating System Sizing and\u00a0P<\/strong><strong style=\"line-height: 1.5;\">reparation of Engineering Design Specification<\/strong><\/h3>\n<p><strong><span style=\"color: #ff6600;\">Multifamily | Commercial | Institutional | Industrial | Government<\/span><\/strong><\/p>\n<h4><span style=\"color: #ff6600;\"><strong>Evaluation<\/strong><\/span><\/h4>\n<p><a href=\"https:\/\/emra.com\/wpcontent\/uploads\/2016\/02\/preparation-of-engineering-design-specification-Save-edges-Copy-of-P1020370.jpg\" rel=\"attachment wp-att-709\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-709 alignright\" src=\"https:\/\/emra.com\/wpcontent\/uploads\/2016\/02\/preparation-of-engineering-design-specification-Save-edges-Copy-of-P1020370-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.emra.com\/wpcontent\/uploads\/2016\/02\/preparation-of-engineering-design-specification-Save-edges-Copy-of-P1020370-300x225.jpg 300w, https:\/\/www.emra.com\/wpcontent\/uploads\/2016\/02\/preparation-of-engineering-design-specification-Save-edges-Copy-of-P1020370-100x75.jpg 100w, https:\/\/www.emra.com\/wpcontent\/uploads\/2016\/02\/preparation-of-engineering-design-specification-Save-edges-Copy-of-P1020370.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>All to often we get requests to come in and design a new boiler plant for a facility.\u00a0 While we are more than happy to do this, our recommended approach is to first see if the existing system is truly at the end of it\u2019s useful life.\u00a0 To do this we first start with an evaluation of your building\u2019s heating plant situation, including combustion efficiency tests of the boiler\/burner plant and review of the system controls and (where available) maintenance logs.\u00a0 From that we determine if it can be brought to a more optimal level of operation.\u00a0 If so we provide a combination of potential upgrade and operational improvements to help your system reach those levels, and extend the life of this very expensive system.<\/p>\n<h4><span style=\"color: #ff6600;\"><strong>A Plan <\/strong><\/span><\/h4>\n<p>After we\u2019ve conducted a site survey, and evaluated the heating plant condition, a report detailing the existing situation and recommended actions will be provided.\u00a0 One of the lead professionals working on your site will then meet with you to review what we found.<\/p>\n<p>We don\u2019t believe in assuming your heating plant needs replacement before we ever step foot in your building, however, if it does our engineers will make sure you get one that meets the needs of your building and does so in the most energy efficient and cost effective manner.<\/p>\n<h4><span style=\"color: #ff6600;\"><strong>A System That Meets Your Needs, and Does So Efficiently<\/strong><\/span><\/h4>\n<p>If necessary, and requested, the proper replacement system size shall be computed to account for the actual heating and, where needed, domestic hot water (DHW) loads of your site.\u00a0 Detailed bid ready specifications will then be developed, that allow for a competitive bidding process.\u00a0 What we\u2019ve found is this process provides our clients with a cost savings that pays for the proper engineering many times over.\u00a0 By then conducting a punch-list and final inspection you are assured that in addition to getting the most appropriate system installed in your facility that system is set up properly and operating at its optimal efficiency level.<\/p>\n<\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":109,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-blank-4.php","meta":{"footnotes":""},"class_list":["post-141","page","type-page","status-publish","hentry","no-post-thumbnail"],"_links":{"self":[{"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/pages\/141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/comments?post=141"}],"version-history":[{"count":15,"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/pages\/141\/revisions"}],"predecessor-version":[{"id":847,"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/pages\/141\/revisions\/847"}],"up":[{"embeddable":true,"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/pages\/109"}],"wp:attachment":[{"href":"https:\/\/www.emra.com\/index.php\/wp-json\/wp\/v2\/media?parent=141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}